Saturday 27 April 2013

New House, New Garage, Progress at Last....


After a year and a half of 'zero' progress, having moved house and had a year working down south (with no chance of working on the the build) I have finally got things up and running again.

Pedals all assembled and installed with bushes etc. Brake master cylinder fitted also.


Bushes fitted and distance tubes installed into the front and rear suspension wishbones and bolted up on a temporary basis. I will need to remove and shorten the tubes to match the bush widths and install additional large diameter washers. Also need to get two spacers made up to fill the gap between the upper mounting flanges for the shock absorber.




Also completed the drill off of the drivers foot well forward panel.

Next step the interior panel at the drivers seat and that should complete the O/S interior panels.....